MEP Works at Jabal Omar Development Project Phase III

- Location: Makkah
- Client: Jabal Omar Development Project
- Main Contractor: Saudi Arabian Construction Co.
- Mep Contractor: Drake & Scull
- Sector: Hospitality
Scope of work
Scope of work: Electromechanical Activities for the project including:
Check Design, Installation, Testing & Commissioning for the following:
• LV Switchgear, Distribution Panel Board
• Indoor Lighting System
• Generator Backup Supply with complete ATS
• Synchronization System including daily and weekly fuel tank
• CCTV System
• Public Address System
• Fire Alarm System
• Grounding System
• Cable Tray System
• Plumbing System including sanitary system
• Hot & Cold Water System
• HVAC System
• Heat Exchanger
• Air Handling units.
• Water Pumps & Related Accessories
• Duct Work & Related Accessories
• Wiring Devices
• Water Distribution System
• Drainage piping System
• Exhaust Fan
• Water storage tank